RPEM Phase 2 – Islington

  1. repem-stage-201
  2. repem-stage-202
  3. repem-stage-203
  4. repem-stage-204
  5. repem-stage-205
  6. repem-stage-206
  7. repem-stage-207
  8. repem-stage-208
  9. repem-stage-209
  1. repem-stage-201
  2. repem-stage-202
  3. repem-stage-203
  4. repem-stage-204
  5. repem-stage-205
  6. repem-stage-206
  7. repem-stage-207
  8. repem-stage-208
  9. repem-stage-209
  • Location

    Essex Road

    Islington

    England

  • The Work

    Richmond are now on Phase 2 of the refurbishment of RPEM London. When Phase 1 was carried out the stage was brought forward and built in front of the old theatre front. Now in Phase 2 Richmond have opened up the old theatre front. Bringing the character of the building to the forefront, Phase 2 has also enabled extra seating at the front.